| 1. |
Operational Status: |
| Is the Licensee/Permittee now operating its fully authorized final, DTV (post-transition) facility? |
Yes No (If YES, go to Section V; If NO, go to Item 2.)
|
| 2. |
If Item 1 is NO (i.e., not fully operational), then indicate operational status of final, DTV (post-transition) facility and indicate date Licensee/Permittee expects to begin full, authorized post-transition operations: (check one)
|
(i)
|
Licensee/Permittee is operating its post-transition facility pursuant to program test authority; see 47 C.F.R. § 73.1620(a). If checked, indicate date Licensee/Permittee expects to file its license to cover (FCC Form 302) application. |
Expected Operational Date:
(mm/dd/yyyy) |
|
(ii)
|
Licensee/Permittee is operating its post-transition facility pursuant to special temporary authority (STA) or at a reduced facility. If checked, indicate power level and percentage of analog population covered by reduced facility. |
Power Level
kW
Population:
% |
|
(iii)
|
Licensee/Permittee is not operating its post-transition facility. |
|
| 3. |
Construction Status: |
| Has the Licensee/Permittee completed construction of its final, DTV (post-transition) facility? |
Yes No (If YES, skip Items 4-5 and go to Item 6(a); If NO, go to Item 4.)
|
| 4. |
If Item 3 is NO (i.e., not fully constructed), then indicate construction status of final, DTV (post-transition) facility and indicate date Licensee/Permittee expects to complete construction: (check all that apply) |
|
(i) Licensee/Permittee has not begun construction of its post-transition facility. |
Expected Construction Date:
(mm/dd/yyyy) |
|
|
(ii) Licensee/Permittee is now constructing its post-transition facility. |
|
|
(iii) Licensee/Permittee has constructed a reduced post-transition facility and additional construction is needed to complete Licensee/Permittee's fully authorized facility. |
|
| 5. |
Construction Permit Status: |
| Does the Licensee/Permittee hold a license or construction permit for its final, DTV (post-transition) facility? |
Yes No
(If YES, go to Item 6(a); If NO, skip Item 6(a) and go to Item 6(b).)
|
| 6. |
| a. |
Does the Licensee/Permittee need to modify its license or construction permit in order to match the post-transition facilities defined for the Licensee/Permittee in the new DTV Table of Allotments, 47 C.F.R. § 73.622(i), as adopted in the Seventh Report and Order in MB Docket No. 87-268? |
Yes No (If YES, go to 6(b); If NO, skip Item 6(b) and go to Section IV.)
|
| b. |
Has the Licensee/Permittee filed an application for a new or modified construction permit for its final, DTV (post-transition) facility? (If YES, indicate relevant FCC File No. and date filed; If NO, indicate date Licensee/Permittee expects to file such application.) (NOTE: To qualify for expedited processing, the Licensee/Permittee must file its application within 45 days of the effective date of the Report and Order in the Third DTV Periodic Review proceeding, MB Docket No. 07-91, as well as meet other criteria established in that proceeding.) |
Yes |
FCC File No.
|
- |
Filing Date: (mm/dd/yyyy) |
No |
Expected Filing Date:
|
(mm/dd/yyyy) |
|
|
|